| If you are not viewing this page as a pop-up window, please visit the Media Gallery first. | |
![]() |
|
| Hangar B - South End Image Source: National Archives (71-CB-138L-35) |
|
By June 7, 1943, the giant 304 foot box beam had been constructed, and set into place. Supported by the two massive concrete pylons located on each side of the hangar, the bottom of this beam will serve as a pocket, for a six-segment door, weighing about 180 tons. |
|
| You may close this window at anytime to view other images in our gallery. |